Installation instructions and methods of spiral chute
- Categories:Industry Dynamic
- Author:
- Origin:
- Time of issue:2021-08-04 17:53
- Views:
(Summary description) 1. First, check the quality of the glass fiber reinforced plastic spiral sheet (especially the quality of the working surface). Only when the size and shape meet the requirements can be assembled. 2. The fastening bolt hole of the spiral piece is generally prepared by the manufacturer in advance. If the manufacturer does not process, in order to ensure compatibility, the same template must be used to make holes. 3. Connect the five spirals to form a set of spiral chute with bolts, and place them horizontally. The connection of two adjacent flanges is based on the smooth transition of the inner surface. When connecting, pay special attention to the surface of the bottom piece not to be lower than the surface of the corresponding bottom piece. Along the radial direction. Take the position from the outer edge (in the direction of the groove width) as the reference, and it is not allowed to be further inward than the outer edge of the lower piece, in order to prevent the scattering of the ore flow. If there is a gap in the connection part, it needs to be smoothed with putty. 4. Combine the four-head (or two-head or three-head) spiral chute in a group of five connected into one, and distribute them into the desired shape. 5. Install 4 (3) pillars on the 4 (or 3, 2) spiral chutes in turn, fix the spiral chute and pillars with bolts, cross) the tripod), so that the spirals of each head are evenly distributed around the circumference. Finally tighten all bolts, after installation 6. When the cutting groove of the mining tank and the product is set at the beginning and end of the spiral chute, the connection part must not leak water. When there is a gap, it must be tightly sealed with paint to ensure that the groove surface is too smooth. 7. The ore homogenizer and the product integrated bucket are not connected to the fuel tank bracket, and are freely placed on the bracket. When installing, pay attention to the correct position as shown in the figure. Each row of the distributor must be matched with the corresponding feeding trough. 8. The foundation of the spiral chute generally does not need to be fixed, but after it is placed on four (three) planes at the same level, after installation, in order to check whether the longitudinal axis of the spiral chute is vertical, shims can be placed under the pillar to adjust Plumbness. The spiral slideway must be set up at an appropriate height, and the spiral slideway pillar and base must be properly connected.
Installation instructions and methods of spiral chute
(Summary description)
1. First, check the quality of the glass fiber reinforced plastic spiral sheet (especially the quality of the working surface). Only when the size and shape meet the requirements can be assembled.
2. The fastening bolt hole of the spiral piece is generally prepared by the manufacturer in advance. If the manufacturer does not process, in order to ensure compatibility, the same template must be used to make holes.
3. Connect the five spirals to form a set of spiral chute with bolts, and place them horizontally. The connection of two adjacent flanges is based on the smooth transition of the inner surface. When connecting, pay special attention to the surface of the bottom piece not to be lower than the surface of the corresponding bottom piece. Along the radial direction. Take the position from the outer edge (in the direction of the groove width) as the reference, and it is not allowed to be further inward than the outer edge of the lower piece, in order to prevent the scattering of the ore flow. If there is a gap in the connection part, it needs to be smoothed with putty.
4. Combine the four-head (or two-head or three-head) spiral chute in a group of five connected into one, and distribute them into the desired shape.
5. Install 4 (3) pillars on the 4 (or 3, 2) spiral chutes in turn, fix the spiral chute and pillars with bolts, cross) the tripod), so that the spirals of each head are evenly distributed around the circumference. Finally tighten all bolts, after installation
6. When the cutting groove of the mining tank and the product is set at the beginning and end of the spiral chute, the connection part must not leak water. When there is a gap, it must be tightly sealed with paint to ensure that the groove surface is too smooth.
7. The ore homogenizer and the product integrated bucket are not connected to the fuel tank bracket, and are freely placed on the bracket. When installing, pay attention to the correct position as shown in the figure. Each row of the distributor must be matched with the corresponding feeding trough.
8. The foundation of the spiral chute generally does not need to be fixed, but after it is placed on four (three) planes at the same level, after installation, in order to check whether the longitudinal axis of the spiral chute is vertical, shims can be placed under the pillar to adjust Plumbness. The spiral slideway must be set up at an appropriate height, and the spiral slideway pillar and base must be properly connected.
- Categories:Industry Dynamic
- Author:
- Origin:
- Time of issue:2021-08-04 17:53
- Views:
1. First, check the quality of the glass fiber reinforced plastic spiral sheet (especially the quality of the working surface). Only when the size and shape meet the requirements can be assembled.
2. The fastening bolt hole of the spiral piece is generally prepared by the manufacturer in advance. If the manufacturer does not process, in order to ensure compatibility, the same template must be used to make holes.
3. Connect the five spirals to form a set of spiral chute with bolts, and place them horizontally. The connection of two adjacent flanges is based on the smooth transition of the inner surface. When connecting, pay special attention to the surface of the bottom piece not to be lower than the surface of the corresponding bottom piece. Along the radial direction. Take the position from the outer edge (in the direction of the groove width) as the reference, and it is not allowed to be further inward than the outer edge of the lower piece, in order to prevent the scattering of the ore flow. If there is a gap in the connection part, it needs to be smoothed with putty.
4. Combine the four-head (or two-head or three-head) spiral chute in a group of five connected into one, and distribute them into the desired shape.
5. Install 4 (3) pillars on the 4 (or 3, 2) spiral chutes in turn, fix the spiral chute and pillars with bolts, cross) the tripod), so that the spirals of each head are evenly distributed around the circumference. Finally tighten all bolts, after installation
6. When the cutting groove of the mining tank and the product is set at the beginning and end of the spiral chute, the connection part must not leak water. When there is a gap, it must be tightly sealed with paint to ensure that the groove surface is too smooth.
7. The ore homogenizer and the product integrated bucket are not connected to the fuel tank bracket, and are freely placed on the bracket. When installing, pay attention to the correct position as shown in the figure. Each row of the distributor must be matched with the corresponding feeding trough.
8. The foundation of the spiral chute generally does not need to be fixed, but after it is placed on four (three) planes at the same level, after installation, in order to check whether the longitudinal axis of the spiral chute is vertical, shims can be placed under the pillar to adjust Plumbness. The spiral slideway must be set up at an appropriate height, and the spiral slideway pillar and base must be properly connected.